Evidence-based BIM delivery for complex programmes.

Technical specifications, procurement frameworks and ROI models for infrastructure and construction leadership.

ROI & Value

The economic case for governed information.

BIM is a risk management and efficiency strategy. We measure value through three core enterprise lenses.

Avoided Cost

Risk Mitigation

Track issues identified before construction, their likely field impact and the decisions that closed them.

Executive value

A project-specific baseline turns coordination activity into auditable avoided-cost evidence.

Decision Lead Time

Operational Efficiency

Measure issue age, approval cycle time, rejected exchanges and time spent locating or recreating information.

Executive value

The business case is built from the client's baseline and agreed measurement method—not a generic industry percentage.

Handover Readiness

Asset Lifecycle

Track verified asset records, unresolved data gaps and acceptance status against the project's information requirements.

Executive value

A measurable readiness view helps avoid transferring incomplete, unverified information into operations.

Technical Environment

Standardised delivery across all major platforms.

Our capability is platform-agnostic but standards-driven, ensuring interoperability and longevity for asset data.

Standards & Protocols

ISO 19650 workflowsCOBie where specifiedIFC 4 / 4.3Project-defined classification

Core Software Stack

Autodesk RevitCivil 3DNavisworksBentley MicroStation/OpenRoadsSolibri

Information Need (LOD/LOI)

LOD 100Concept/Spatial Arrangement
LOD 200Approximate Geometry and Systems
LOD 300Precise Geometry and Precise Performance Data
LOD 400Fabrication and Assembly Readiness
LOD 500Verified As-Built for Asset Management

Delivery methodology

A controlled path from requirement to acceptance.

Each stage has defined decisions, outputs and review gates. The exact method is tailored to the appointment and project information requirements.

01

Frame

Confirm outcomes, obligations, interfaces, scope boundaries and acceptance criteria.

02

Mobilise

Agree the delivery plan, responsibilities, systems, access and assurance gates.

03

Deliver & control

Produce or review information through governed exchanges, issue ownership and reporting.

04

Accept & transfer

Verify outputs against agreed requirements and record residual risks and handover status.

Deliverables

Sample outputs for scope and acceptance discussions.

These are output types—not client projects. Final content, format and acceptance criteria are defined in each appointment.

COORDINATION

Fig 1.1: Federated Infrastructure Model

Multi-platform integration of rail, structural, and utility models for corridor coordination.

GOVERNANCE

Fig 1.2: ISO 19650 Compliant BEP

Standardised BIM Execution Plan defining roles, exchanges, and governance protocols.

LIFECYCLE

Fig 1.3: Asset Information Model (AIM)

Digital representation of a physical asset with integrated maintenance schedules and specifications.

QA/QC

Fig 1.4: Clash Resolution Matrix

Governed log of multidisciplinary issues, ownership, and resolution status.

Collateral

Technical briefs

Downloadable documents for internal review, tender preparation and stakeholder alignment.

Enterprise BIM Capability Statement

  • Operating Model: Governance, People, and Delivery
  • Sector Specialisms: Infrastructure, Industrial, and Complex Real Estate
  • Technical Capacity: Software, Standards, and QA Workflows
  • Case Study Framework: Problem, Approach, and Verified Outcome
Download PDF

Enterprise BIM Procurement Guide

  • Scope Definition: Outcomes, Requirements, and Interfaces
  • Evaluation Framework: Capability Beyond Day Rates
  • Commercial Models: Defined Package, Retainer, or Managed Team
  • Evidence: Deliverables, Acceptance, and Risk Controls
Download PDF

Procurement

Compliance & Engagement

A scope-led route for engagements from €50k to €1M+, subject to confirmed deliverables, duration, team, interfaces and risk allocation.

Governance

  • ISO 19650-aligned workflows where required by the appointment
  • Defined information-management responsibilities and approval authority
  • Security requirements mapped to the client's project protocol
  • Evidence schedule agreed during procurement and mobilisation

Engagement Models

BIM as a Service (BaaS)

Managed delivery capacity scaled to programme demand.

Project-Based Coordination

Fixed-scope multidisciplinary clash and issue governance.

Retained Advisory

Ongoing governance and independent assurance for project owners.

Next step

Schedule a technical capability review.

Discuss your project standards, delivery pressures and information requirements with a BIM specialist.